Greenspire 7th filing site map

Town Board approves 52 lots at Greenspire on the banks of Windsor Lake

WINDSOR — The next addition to the Greenspire Subdivision in Windsor is about to take shape. The Windsor Town Board in August approved the subdivision master plan for another 52 lots to be built on the north banks of Windsor Lake, officially called Greenspire 7th Filing. Greenspire, in total, was...

Similar Posts