First-floor suite of The William Building ready for tenant buildout

BOULDER — The first-floor suite of The William Building in downtown Boulder is ready for a build-to-suit finish, developer W.W. Reynolds announced.  The exterior of the 25,146-square-foot Class A office building, at 1650 Canyon Blvd., was completed in 2020. It consists of three stories. The first-floor suite available for build-to-suit...

Similar Posts